Plastic steel window installation specification introduces the precautions for the installation of plastic steel window

Some of our renovation projects have many processes. When we decorate, we have to install some windows. So what do you know about the installation rules of plastic-steel windows? If you still don’t understand it, our small series can introduce you to the plastic-steel window. What are the installation specifications, what are the precautions for the installation of plastic steel windows , and what are some of the advantages of our plastic steel window installation specifications.


塑钢窗安装规范


First, the advantages of plastic steel window installation specifications


1, not only beautiful and durable, but also the lowest thermal conductivity. It is far superior to wood windows, iron windows and aluminum alloy windows in terms of energy saving, and is the most effective sealing method. Ordinary plastic steel is moderately priced and economical. The high-grade plastic steel window has good heat preservation and is resistant to aging and is not easily deformed.


2. Most of the buildings are now popular, with a large amount of use and a wide range of use. Because plastic steel windows do not use metal, the country also recommends it.


3, reduce heat conduction: the use of heat-insulated bridge aluminum alloy profiles, its heat transfer coefficient of 1.8 ~ 3.5W / m2 · k is much lower than ordinary aluminum alloy profiles.


4. Prevent condensation: The temperature of the inner surface of the profile with the heat insulation strip is close to the indoor temperature, which reduces the possibility that the indoor moisture will condense on the surface of the profile due to supersaturation.


5, energy saving: in the winter, the window frame with heat insulation strip can reduce the loss of heat through the window frame by 1/3; in the summer, if there is air conditioning, the window frame with heat insulation strip can Reduce energy loss more.


6. Protecting the environment: Through the application of the insulation system, energy consumption can be reduced, and environmental radiation due to air conditioning and heating is reduced.


7. Reduce noise: The hollow glass structure with different thickness and the hollow structure of the heat-insulated bridge aluminum profile can effectively reduce the resonance effect of sound waves, prevent the transmission of sound, and reduce the noise by more than 30dB.


8, colorful colors: the use of anodizing, powder coating, fluorocarbon spray surface treatment can produce aluminum profiles of different colors, after rolling combination, so that the insulated aluminum alloy doors and windows produce indoor and outdoor two-color windows of different colors.


Second, the introduction of plastic steel window installation specifications


1. According to the installation position, size and elevation of the doors and windows in the design drawings, the door and window edges are measured according to the center line of the door and window. For multi-storey or high-rise buildings, the edge of the top and bottom windows and doors shall prevail, and the edge of the door and window shall be led by a line pendant or theodolite, and shall be marked at the door window of each layer, and the individual non-straight sides shall be chiseled.


2. The horizontal position of the doors and windows should be reversed by the horizontal line of the floor indoor +50cm, and the empty lower skin level should be measured, and the elastic line should be straight. Each layer must maintain the same height of the window. Plastic steel door and window draping installation: Fix the draping on the plastic steel window according to the requirements of the construction drawings, and ensure that the position is correct and the installation is firm.


Third, plastic steel window installation specifications precautions


1, line positioning


(1) According to the installation position, size and elevation of the doors and windows in the design drawings (the term "elevation" is provided by the industry encyclopedia), the door and window edge lines are measured according to the center line of the door and window. If it is a multi-storey or high-rise building (the term "high-rise building" is provided by the industry encyclopedia), the edge of the top and bottom windows and doors shall prevail, and the edge of the door and window shall be led by a line pendant or theodolite, and shall be marked at each door window. For individual not straight mouths should be handled.


(2) The horizontal position of the doors and windows should be based on the horizontal line of the floor indoor +1250px, and the height of the window should be measured upwards. The bullet line (the term "elastic line" is provided by the industry encyclopedia) is straight. Each layer must maintain the same height of the window.


2, anti-corrosion treatment


(1) When the anti-corrosion treatment design of the outer surface of the door and window frame is required, it shall be treated according to the design requirements. If the design does not require it, it can be coated with anti-corrosion coating or plastic film to protect the cement mortar from direct contact with the surface of the aluminum alloy door and window, resulting in electrochemical reaction and corrosion of aluminum alloy doors and windows.


(2) Installation of aluminum (the term "aluminum" is provided by the industry encyclopedia) alloy (entry "alloy" provided by the industry encyclopedia) doors and windows, if the use of connecting iron parts to fix, then connect iron parts, fixing parts, etc. Metal parts are preferably made of stainless steel. Otherwise, anti-corrosion treatment must be carried out to avoid electrochemical reaction and corrosion of aluminum alloy doors and windows.


塑钢窗安装规范


Now our friends know what some plastic steel window installation specifications are, and our plastic steel window installation specifications have some precautions. Friends must read the plastic steel window installation specifications several times. Everyone also learned that the advantages of the plastic steel window after installation are, then everyone wants to know what decoration information, just look for the decoration home network.


More related wonderful reading:

How to clean plastic windows? Precautions when using plastic steel window

Plastic steel window pulley type introduction plastic steel window pulley purchase skill

How many years can a plastic steel window be used? What are the maintenance methods for plastic steel windows?

How to replace the plastic window seal? Plastic steel window sealing installation matters

How to adjust the plastic steel window handle? Plastic steel window handle brand

Transparent Iron Oxide for Ink

Red Iron Oxide,Black Iron Oxide,Ferric Oxide Yellow,Ferric Oxide Pigment

TINOX CHEMIE GMBH , https://www.tinoxglobal.com