Strive to think and move tile construction ten major attention

Tile laying is a technical activity and you can't just look at the flatness of the surface. Think and think, think of a good account before paving, and act with confidence to save a lot of waste.


Oushenuo Tile Dongpeng Tiles

1, tile soaked water on demand

Now often see some customers to retreat tiles that have not been used, and found that some can not be returned, because the tiles bubbled over. Manufacturers or businesses nowadays can not be returned in general, if there is no use of tiles that will cause unnecessary waste. Suggestions: How much foam to use, how much foam to build, how much foam to build, not to brew it all at once, and to combine the construction progress of the workers.

2, tiles in the paving before making a row plan

Many of the construction workers started to shop when they got the bricks. When the paving went to a certain extent, it was found that the tile bricks were ineffective and the proportions were inconsistent, so they were removed and re-paved, causing unnecessary wear and tear. Suggestion: Make a paved brick plan before paving.

3, the correct choice of cement marking and mix the proportion of cement sand

Many friends came across the cracking of the tiles, some of which were caused by improper mixing of cement sand or excessively high cement markings. The proportion of cement was large, the bonding strength of the tiles was strong, and the bricks quickly became tight. However, the cement mixing ratio is high, and the expansion coefficient of cement mortar is large, so it is easy to crack the brick after laying. The recommended ratio is 1:3 for wall tiles, 1:2-2-3 for floor tiles, and cement number 32.5 for cement.

4, tile processing should be careful

In particular, when the wall tiles are in contact with the sun's corners, be careful not to damage the glaze of the tile. Be careful of the gap when linking. Do not make it too small.

5, when dealing with the flue or when the wall is built must be standardized

Re-walling can not use big core board as wall material (this kind of practice is known to be not feasible, but workers in construction often do so, so as the owner must pay attention), tiling is easy to cause the tiles to arch off and Cracking.

6, the seam of the tiles can not be too small

Tile joints are too small to reduce the service life of tiles. Tiles are used to crack the glaze when they are subjected to thermal expansion and contraction.

Recommendation: Whether it is a seamed tile or a seamless tile, be sure to pay attention to the remaining joints during construction.

7, to inform workers in the construction of tiles found timely notice

This is the place where the current decoration company has done relatively poorly in construction. When this kind of situation is encountered, especially when the material is not their recommendation, construction will often continue. In fact, this approach is completely irresponsible. After all the paving, you find that there is a problem, it is more troublesome to deal with, the construction side and the material side of each other, and finally rework, this process will consume a lot of energy and financial resources. Therefore, during the construction, it is necessary to clearly tell the workers that if problems are found, they must be notified in a timely manner.

Recommendation: In order to avoid this situation, it is best to notice the problem in a timely manner, you can ask the seller and the construction side together to identify, do not drag things to the end of the final solution.

8, the best filler and other tiles dry after the

Collapsing Nowadays, many workers begin to make joints immediately after the tiles are laid, which is very inappropriate. Because the tiles are not completely dried, the tiles are likely to loosen in the process of jointing, and the tiles will fall off later. , leaving security risks.

Advice: Tiles are allowed to dry before the tiles are dried. Normally any time after 24 hours.

9, the wall surface before the tiling to clean the wall

Some irresponsible construction teams scraped putty wall tiles on the wall when laying the wall tiles. They did not scrape the putty and put it on the brick directly. The safety hazards of this approach are very large. Because the cement is so big, Putty can not hang on the cement, easily lead to the loss of tiles. This is also very insecure!

Suggestion: The wall surface must be inspected before tiling. If the wall has cracks, it must be treated first and the wall surface cleaned.

10. The tiles are protected when paving, do not scratch the brick surface, contaminate the brick surface

Moving around brick surfaces that are not solidified, wall painting, and the absence of a protective film on the floor of the paint often occur during the construction process, and these will cause damage to the tiles.

Buy building materials to win IPAD!

Links: The following 10 practices are unreasonable