Correct maintenance of manual hoist for easy operation

1. Proper maintenance of the manual hoist chain is essential for its safe and efficient operation. Regular lubrication should be performed to ensure smooth movement and reduce wear and tear. 2. If the hoist is not used for an extended period, it is important to perform thorough cleaning and anti-corrosion treatment. Inspect the equipment regularly to ensure all functions are working properly and no damage has occurred. 3. Routine inspection and maintenance of key components of the manual hoist are crucial to identify and eliminate potential safety hazards before they become a problem. This includes checking gears, hooks, and the braking system. 4. The braking mechanism must remain clean and free from debris. Regular checks should be conducted to prevent unexpected brake failure, which could lead to dropped loads and serious accidents. 5. When using the manual hoist on rainy days, take precautions by providing proper rain protection to prevent water from entering the internal mechanisms, which can cause rust and malfunction. 6. Always keep the chain hoist and its accessories dry. After each use, store the hoist in a dry, well-ventilated area, away from high temperatures and chemical exposure to maintain its longevity and performance. 7. It is also recommended to keep a maintenance log to track when inspections and servicing were last performed. This helps ensure that the hoist remains in optimal condition and complies with safety standards. 8. Training for users is equally important—make sure everyone who operates the hoist understands the proper procedures, safety protocols, and signs of wear or damage. 9. Never overload the hoist beyond its rated capacity, as this can lead to mechanical failure and dangerous situations. Always check the load limit before use. 10. In case of any unusual noises, resistance, or performance issues, stop using the hoist immediately and have it inspected by a qualified technician before resuming operation.

Open Cut Tunnel Trolley

In order to solve the problem of low construction efficiency when the existing waterproof board paving trolley is used to install the reinforcement of the lining of the open tunnel, which affects the construction progress. The remaining two of the four steel bar installation platforms are arranged in the middle of the main body of the paving trolley and are arranged symmetrically. One end of each steel bar installation platform is fixed to the main body of the paving trolley. One end is fixedly connected with the arc positioning steel bar.

Open Cut Tunnel Trolley,Tunnel Trolley For Moulds,Double Trolley Liner,Lining Formwork Trolley

Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com